凿岩机漏气、漏水怎么安全排查 Safely Checking Air & Water Leaks

从接头、软管、密封和外部连接整理漏气漏水检查顺序,内部拆检前必须停机断气卸压。 Check connections, hoses, seals and external joints. Stop, isolate air and depressurize before internal inspection.

01

先确定泄漏位置和条件 Identify location and conditions

记录是接通气水后立即泄漏、工作时泄漏还是停机后残余泄漏,并观察软管、接头、阀体和外部连接位置。 Record whether leakage starts on supply connection, during operation or after shutdown. Observe hoses, fittings, valve bodies and external joints.

02

外部检查不等于带压拆卸 External checks do not mean pressurized dismantling

可在安全状态下检查松动、破损和明显磨损;任何拆卸前都必须停机、关闭气水源并确认完全卸压。 Check looseness, damage and visible wear only in a safe state. Before any dismantling, stop, isolate air/water sources and verify complete depressurization.

03

密封和内部通道按型号检修 Service seals and internal passages by model

持续泄漏或内部串流应由专业人员依据当前型号资料处理,不用通用经验替代正式尺寸和装配要求。 Persistent leaks or internal cross-flow require qualified service using current model documentation, not general assumptions about dimensions or assembly.

  • 泄漏位置照片 Photographs of leak location
  • 发生条件 Conditions when it occurs
  • 软管与接头 Hoses and fittings
  • 型号和铭牌 Model and nameplate
  • 维修记录 Repair history